The latest confirmed development in the cargo lift handoff is that a limited route trial starts with a dated sign at each affected junction. The update comes from the cargo lift at Three Roots Junction; the existing arrangement remains in force until the board closes this window.

Mina Copper, lift handoff clerk, confirmed 41 loads with a confirmed signal at both landings in the file. The previous window recorded 36; the totals do not settle how an operator knows a load is ready when the two landings do not hear the same bell.

The unresolved point is specific: Operators rely on the signal at their own landing. Loaders ask for a shared confirmation before the lift moves. No final outcome has been posted before the scheduled decision.

Residents and staff continue under the current schedule while the review is open.

NEXT UPDATE: The Year first, deep rest window 2 file remains open for its scheduled decision. The lift board will test a two-landing signal before the next heavy load. A fresh window will use a new date and source record.