STATUS: Asecond reader compares each mark with the location on the wall. The current arrangement remains in place at the cargo lift at Three Roots Junction.
RECORD: load cards, bell signals and the outgoing operator’s handoff slate. The count is 88 loads with a confirmed signal at both landings; the prior window recorded 94.
DISPUTE: Operators rely on the signal at their own landing. Loaders ask for a shared confirmation before the lift moves.
OUTCOME: The hearing is still open and no permanent rule has changed.
NEXT: The Year third, deep rest window 2 file remains open for its scheduled decision. The lift board will test a two-landing signal before the next heavy load.