The latest confirmed development in the condensation drain repair is that residents and route crews submit corrections before the public table closes. The update comes from the east condensation channel; the existing arrangement remains in force until the board closes this window.
Tikka Reed, public works reporter, confirmed 45 sections with a dry wall mark after a full cycle in the file. The previous window recorded 39; the totals do not settle how residents can tell whether a wet wall comes from a blocked drain or a delayed release.
The unresolved point is specific: Repair crews use the upper drain card. Households ask for a mark from the lower joint that stayed wet. No final outcome has been posted before the scheduled decision.
Residents and staff continue under the current schedule while the review is open.
NEXT UPDATE: The Year fifth, deep rest window 2 file remains open for its scheduled decision. The next inspection will note both upper release and lower wall condition. A fresh window will use a new date and source record.