The latest confirmed development in the flood gate branch markers is that the board publishes two route options with access and repair limits stated. The update comes from the low branch gates beneath Moss Row; the existing arrangement remains in force until the board closes this window.

Kip Moss, branch marker inspector, confirmed 78 gates with a marker visible from the dry side in the file. The previous window recorded 80; the totals do not settle whether a gate can be identified before a crew enters a wet branch.

The unresolved point is specific: The water crew can see the marker while operating the wheel. Residents need to identify the gate from the dry passage. No final outcome has been posted before the scheduled decision.

Residents and staff continue under the current schedule while the review is open.

NEXT UPDATE: The Year fifth, store season window 2 file remains open for its scheduled decision. The inspector will test marker visibility from the dry approach and wheel station. A fresh window will use a new date and source record.