The Year first, first seep window 2 review of the low pressure well reached a new step at the southern well beneath Moss Row. The board publishes two route options with access and repair limits stated. The Year first, first seep window 2 file remains open for its scheduled decision. The well board will place recovery marks beside the pump schedule.
Ari Flint, well level reader, said the latest file records 95 pump cycles with a matching level reading. The preceding window recorded 99; the figures cover entries on the register, not every condition at the site.
The pump operator counts cycles. Households track the level at the lower room before the next draw. At the latest public meeting, residents asked the clerk to keep their account beside the source count.
The pump cycle cards, water level marks and the lower room queue lists 95 pump cycles with a matching level reading; the previous window lists 99. Kip Copper checked both against check-out slips compared with the handoff mark at the next station. The next measurement is assigned to a second office and will be published with its method.
The Year first, first seep window 2 file remains open for its scheduled decision. The well board will place recovery marks beside the pump schedule.