The latest confirmed development in the low pressure well is that the clerk attaches the current passage map and the last change card. The update comes from the southern well beneath Moss Row; the existing arrangement remains in force until the board closes this window.

Ari Flint, well level reader, confirmed 50 pump cycles with a matching level reading in the file. The previous window recorded 52; the totals do not settle how to schedule a shared draw when the well recovers at a different time than the pump cycle.

The unresolved point is specific: The pump operator counts cycles. Households track the level at the lower room before the next draw. No final outcome has been posted before the scheduled decision.

Residents and staff continue under the current schedule while the review is open.

NEXT UPDATE: The Year second, first seep window 1 file remains open for its scheduled decision. The well board will place recovery marks beside the pump schedule. A fresh window will use a new date and source record.