STATUS: Alimited route trial starts with a dated sign at each affected junction. The current arrangement remains in place at the South Rain Entry.

RECORD: barrier checks, runoff marks and the maintenance shift log. The count is 65 rain events with a clear bypass marked before water reaches the first branch; the prior window recorded 70.

DISPUTE: The works office measures the barrier. Residents ask that the bypass width be measured during runoff.

OUTCOME: The hearing is still open and no permanent rule has changed.

NEXT: The Year third, vent change window 2 file remains open for its scheduled decision. The next test will record barrier height and bypass width together.