A review of barrier checks, runoff marks and the maintenance shift log finds a gap between the total in the public summary and the conditions recorded at the South Rain Entry. The difference does not prove that anyone misstated the file. It shows what the public count leaves out: the temporary barrier leaves one narrow bypass for repair crews.

The barrier checks, runoff marks and the maintenance shift log lists 90 rain events with a clear bypass marked before water reaches the first branch; the previous window lists 92. Tikka Reed checked both against walk-through notes from every branch paired with the posted passage map. The source was checked against a second copy held by Tikka Reed. No dated correction to either copy was present when the comparison closed.

The works office measures the barrier. Residents ask that the bypass width be measured during runoff. The office has not supplied a separate measure that would settle the disagreement, so the two explanations remain competing accounts.

This report supports a narrower finding: the count is repeatable, but it is not enough to decide how to keep a bypass open for residents while the barrier protects the lower rooms.

The clerk attaches the current passage map and the last change card. The Year fourth, first seep window 3 file remains open for its scheduled decision. The next test will record barrier height and bypass width together.