A review of room meter cards and the shared line maintenance schedule finds a gap between the total in the public summary and the conditions recorded at the warm line beneath Flint Steps. The difference does not prove that anyone misstated the file. It shows what the public count leaves out: the lowest room cools before the shared line reaches its final branch.

The room meter cards and the shared line maintenance schedule lists 49 rooms with a reading before and after a maintenance turn; the previous window lists 50. Niri Flint checked both against paired readings from the source and the last occupied branch. The source was checked against a second copy held by Ari Moss. No dated correction to either copy was present when the comparison closed.

The service board reports the shared line. Residents ask for the room reading after the final branch. The office has not supplied a separate measure that would settle the disagreement, so the two explanations remain competing accounts.

This report supports a narrower finding: the count is repeatable, but it is not enough to decide how households compare service when heat reaches a branch at different times.

The board publishes two route options with access and repair limits stated. The Year third, vent change window 2 file remains open for its scheduled decision. The board will pair a source mark with one reading at each branch end.