The latest confirmed development in the shared cistern levels is that a field walk checks the route from entry point to final branch. The update comes from the cistern at Lantern Well; the existing arrangement remains in force until the board closes this window.
Rook Moss, household water delegate, confirmed 47 draw turns recorded at each branch connection in the file. The previous window recorded 51; the totals do not settle how a shared cistern turn is measured at the branch that fills last.
The unresolved point is specific: The cistern keeper counts one release. The far branch residents say their turn begins after the near room has closed its valve. No final outcome has been posted before the scheduled decision.
Residents and staff continue under the current schedule while the review is open.
NEXT UPDATE: The Year third, vent change window 2 file remains open for its scheduled decision. The draw board will show start and end marks at each branch valve. A fresh window will use a new date and source record.