The first file on the surface pass gate began with pass slips, weather readings and the gate opening board. The city then checked the source, heard affected residents and sent a second office to repeat the count.

The current Year first, deep rest window 2 file records 17 open hours with a posted weather reading; the previous window records 16. The longer sequence makes the change visible, while each count remains tied to its own dates.

A turning point was the observation that the outside cloud mark can change after the lower gate is checked. It narrowed the discussion from a general claim to a question about how the rule works at the site.

The gate crew posts conditions at entry. Travelers ask for an update before committing to the upper climb. The shared record is larger than it was at the start, although the parties still assign it different weight.

Alimited route trial starts with a dated sign at each affected junction. The Year first, deep rest window 2 file remains open for its scheduled decision. The pass office will add a second notice at the halfway shelter.